On July 4, 2010, the 3-person team led by SCG project operation director, Mr. Surapon visited Sinoma EC. Sinoma EC’s Chairman of Board of Directors, Mr. Zhang Qi, General Manager, Mr. He Xinping, Vice President, Mr. Ge Liwu, Chief Engineer, Mr. Dong Lanqi respectively met with them.

 

">

91精品国产综合久久久蜜臀粉嫩-国产一级 黄 片-人妻少妇精品视中文字幕国语-免费视频91蜜桃-国产色婷婷五月精品综合在线-成人福利国产午夜av免费不卡在线-九九色影院-正在播放的国产a一片-久久久伦理片-亚洲宅男精品一区在线观看-日本精品videossex 黑人-俄罗斯xxxx性全过程-日本三级大全-国产女人高潮抽搐叫床视频-亚洲最大中文字幕无码网站-国产精品1区-国产真实露脸乱子伦-亚洲男同gv在线观看-午夜精品视频-国产黄视频在线观看

Position: 首頁 < Home < News < Company News

Technical Communications between Sinoma EC and SCG

PublishDate:2010-07-13 Source:

On July 4, 2010, the 3-person team led by SCG project operation director, Mr. Surapon visited Sinoma EC. Sinoma EC’s Chairman of Board of Directors, Mr. Zhang Qi, General Manager, Mr. He Xinping, Vice President, Mr. Ge Liwu, Chief Engineer, Mr. Dong Lanqi respectively met with them.

In the two-day meeting, technical details were talked, including WHR power plant operation, maintenance, spare parts supply and plant overhauling. Leaders and employees from marketing, project execution, technical and R&D, procurement, after sale divisions attended these discussions.

Sinoma EC built 6 WHR power plant for 3 cement plants of SCG, with total installed capacity of 58MW. The WHR plants for SCG TS plant first phase (9MW), second phase WHR (22MW), TL plant (18MW), LP plant(9 MW) were built by Sinoma EC, and all of them are now in good operation.